Эксоцман
на главную поиск contacts

HKUST Logistics & Supply Chain Management Institute (LSCMI)

Обновлено: 09-12-2010
Тематические разделы:
Тип организации
Центры, Исследовательские и аналитические
Цели и задачи
The mission of the Logistics and Supply Chain Management Institute is:
  • to acquire, advance and disseminate methodologies in the design, development, and management of integrated logistics networks and global supply chains through research, education and industry cooperation to provide world leadership in Logistics and Supply Chain management research;
  • to work with government and industry to enhance the development of logistics and supply chain management to integrate the needs of Hong Kong with its vicinity;
  • for the well-being of Hong Kong's economy
  • Руководитель
    Prof. Chung-Yee Lee (Prof. and Head of IEEM)
    Учебные курсы
    Исследовательские проекты
    Construction and Control of Virtual Manufacturing Organizations (2000 to 2003) by Liu, L. with HK$800,000 from NSFC / RGC Joint Research Scheme

    Decision Support Tools for Intelligent Multi-modal Transportation Logistics Management Systems (April 2002 to September 2004) by Lee, C.Y., and V. Hsu with HK$6,207,000 from Innovation and Technology Commission

    Design and Control of Multi-Site Service Systems with Customer Balking (2002 to 2003) by Liu, L. with HK$821,817 from RGC Competitive Earmarked Research Grant

    Development of Rehabus Information Management System (July 2001 to August 2004) by Cheung, R., J.Ho, C. Li with HK$700,000 from Hong Kong Society for Rehabilitation

    Global Supply Chain Management for E-cold Storage by Tseng, M. with HK$150,000 from Seapower Resources International

    Integrating Statistical and Automatic Process Control Approaches for Non-Normal Quality Control Situations (2001 to 2002) by Tsung, F. with HK$30,700 from PROCORE - France/Hong Kong Joint Research Scheme

    Inventory Lot Sizing model and Outbound Shipment Consolidation at a Third Party Warehouse (January to December 2002) by Lee, C.Y. with HK$100,000 from DAG

    Machine Scheduling with Truck Routing Decisions (September 2001 to August 2003) by Li, C.L. with HK$387,248 from Competitive Earmarked Research Grant, Hong Kong RGC

    Modeling and Optimization for Configure-to-Order System in E-Business Environment (September 2001 to August 2004) by Liu, L. with HK$762,762 from RGC Competitive Earmarked Research Grant

    Multistage Information Sharing for Statistical Process Control (2001 to 2003) by Tsung, F. with HK$387,248 from RGC Competitive Earmarked Research Grant

    Quality Control for a Multistage Process Combining SPC and APC (2000 to 2002) by Tsung, F. with HK$437,817 from RGC Competitive Earmarked Research Grant

    Re-intermediation of Supply Chain for Hotel Suppliers by Tseng, M. with HK$150,000 from Asia Trader

    Scheduling with Negotiable Third-Party Machines (December 2001 to November 2004) by Cai, X. and C.Y. Lee with HK$580,873 from Research Grants Council of Hong Kong

    A Study of Lotstreaming and Scheduling in Multi-stage Production with Due Date Constraints (April 2001 to April 2002) by Liu, J. and E. Wagneur with HK$24,000 + FF25,000 from RGC and French General Consulate (France/HK Joint Research Scheme)

    Tactical and operational planning for Real-time Distribution Management (December 2001 to December 2003) by Cheung R. with HK$387,248 from CERT/RGC
    Публикации
    Lee, C.-Y., Y. He, and G. Tang, " A Note on "Parallel Machine Scheduling with Non-simultaneously Machine Available Times"," Discrete Applied Mathematics, 100, (2000), pp. 133-135.

    Lee, C.-Y. and Z. L. Chen, "Scheduling of Jobs and Maintenance Activities on Parallel Machines," Naval Research Logistics, 47, (2000), pp. 145-165.

    Cetinkaya, S, and C.-Y. Lee, "Stock Replenishment and Shipment Scheduling for Vendor Managed Inventory Systems," Management Science, 46, (2000), pp. 217-232.

    Cai, X., C.-Y. Lee and T.-L. Wong, "Multi-processor Job Scheduling to Minimize the Maximum Tardiness and the Total Completion Time," IEEE Transactions on Robotics and Automation, 16, (2000), pp.824-830.

    Lee, C.-Y., and Z. L. Chen, "Machine Scheduling with Transportation Considerations," Journal of Scheduling, 4, (2001), pp. 3-24.

    Lee, C.-Y., and J. Leon, "Machine Scheduling with A Rate-Modifying Activity," European Journal of Operational Research, 128, (2001), pp. 119-128.

    Zhang, G., X. Cai, C.-Y. Lee, and C.K. Wong, "Minimizing makespan on a single batch processing machine with nonidentical job sizes" Naval Research Logistics, 48, (2001), pp. 226-240.

    Lee. C.-Y., S. Cetinkaya, and A. P. M., Wagelmans "A Dynamic Lot Size Model with Demand Time Windows," Management Science, 47, (2001), pp.1384-1495.

    Lee, C.-Y., and C.-S. Lin, "Single-Machine Scheduling with Maintenance and Repair Rate-Modifying Activities,," European Journal of Operational Research, 135, (2001), pp. 491-513.

    Lee, C.-Y., and L. Lei, "Multiple-Project Scheduling with Controllable Project Duration and Hard Resource Constraint: Some Solvable Cases," Annals of Operations Research, 102, (2001), pp. 287-307.

    Vairaktarakis, G, X.Q. Cai, and C.-Y. Lee, "Workforce Planning in Synchronous Production Systems," European Journal of Operational Research, 136, (2002), pp. 551-572.

    Chen, Z.-L. and C.-Y. Lee, "A Column Generation Algorithm for Parallel Machine Common Due Window Scheduling," European Journal of Operational Research, 136, (2002), pp. 512-527.

    Cetinkaya, S., and C.-Y. Lee, "Optimal Outbound Dispatch Policies: Modeling Inventory and Cargo Capacity," Naval Research Logistics, 49, (2002), pp. 531-556.

    Tseng, M M and Jiao, J, "Computer-Aided Requirement Management for Product Definition: A Methodology and Implementation", Concurrent Engineering: Research and Application, Vol. 6, No. 2, pp. 145-160, 1998.

    Tseng, Mitchell M., Jianxin Jiao and Chuan-Jun Su, "Virtual Prototyping for Customized Product Development", Integrated Manufacturing Systems, Vol.9, No.6, pp. 334-343, 1998.

    Mitchell M. Tseng, Ma Qinhai and Chuan-Jun Su, "Mapping customers' service experience for operations improvement", Business Process Management Journal, 1998 (In press).

    Jiao, Jianxin and Mitchell M. Tseng, "A Pragmatic Approach to Product Costing Based on Standard Time Estimation", International Journal of Operations & Production Management, 1998 (In Press).

    Jiao, Jianxin and Mitchell M. Tseng, "Fuzzy Ranking for Concept Evaluation in Configuration Design for Mass Customization", Concurrent Engineering: Research and Application, Vol. 6, No. 3, pp. 189-206, 1998.

    Jiao, Jianxin, Mitchell M. Tseng, Vincent G. Duffy and Fuhua Lin, "Product Family Modeling for Mass Customization", Computers and Industrial Engineering, Special Issue on Selected Papers from 22nd ICC&IE, 1998 (To Appear).

    Su, C.J., Sun, T.L. and Tseng, M., "A Knowledge Based Semantics Recovery Module for Mechanical Engineering Drawings", Engineering Design and Automation, 1998 (Accepted). Jiao, Jianxin and Mitchell M. Tseng, "A Methodology of Developing Product Family Architecture for Mass Customization", Journal of Intelligent Manufacturing, Special Issue on Technical Information Management for Design and Manufacturing, Vol.9, 1998 (In Press).

    Tseng, M.M. and Du, X., "Design by Customers of Mass Customization Products", CIRP Annals, Vol.47/1, pp.103-106, 1998.

    Chen, Y, Tseng, M M and Yien, J, "Economic view of CIM system architecture", Production Planning and Control, Vol.9, No.3, pp.241-9, 1998.

    Chen, Y. and Tseng, M.M., "A Stair-Like CIM System Architecture", IEEE Transactions on Components, Packaging, & Manufacturing Technology Part C: Manufacturing, Vol.20, No.2, pp.101-10, 1998.

    Mitchell M. Tseng, Lei Ming and Guan Zailin, "A Market-Based Coordination Mechanism for Resource Allocation in Mass Customization Manufacturing", 1998 Japan-USA Symposium on Flexible Automation, pp.637-640, Otsu, Japan, July 12-15, 1998.

    Tseng, M M, Su, C Jun and Ma, Q., "Accountability Centered Approach to business process reengineering", Proceedings of the Thirty-First Hawaii International Conference on System Sciences, pp.345-54, Vol.4, Kohala Coast, HI, USA, 6-9 Jan. 1998.

    Cheung, R. K. and Powell, W. B., "SHAPE: A Stochastic Hybrid Approximation Procedue for Two-Stage Stochastic Programs, with an application to dynamic networks," Operations Research, To appear, Jan.-Feb., 2000.

    Cheung, R. K. and Muralidharan, B.,. "Impact of dynamic decision making on hub-and-spoke freight transportation networks," Annals of Operations Research , Vol. 87, 49-71, 1999.

    Cheung, R. K. and Muralidharan, B., "Dynamic Routing for Priority Shipments in Less-than-truckload service networks," Transportation Science, To appear, 1999.

    Powell, W., Snow, W., and Cheung, R. K., "Adaptive labeling algorithms for the dynamic assignment problem," Transportation Science, To appear, 1999.

    Cheung, R. K. and Chen, C-Y., "A two-stage stochastic network model and solution methods for dynamic empty container allocation problem," Transportation Science, Vol. 32, No. 2, 142-162, 1998.

    Wan, Y., Cheung, R. K., Liu, J. and Tong, J., "Warehouse location problems for air-freight forwarders. Journal of Air Transport Management," Vol. 4, 201-207, 1998.

    Cheung, R. K., "Iterative Methods for Dynamic Stochastic Shortest Path Problems," Naval Research Logistics, Vol. 45, 769-789, 1998.

    Cheung, R. K. and Powell, W. B., "Models and Algorithms for Distribution Problems with Uncertain Demands," Transportation Science, Vol. 30, No. 1, 43-59, 1996.

    Ting, J.-H., Cheung, R. K. and Chen, C.-Y., "Stochastic and Dynamic Network Optimization Model for Minimizing Empty Container Allocation costs," Proceedings of the Fifth Industrial Engineering Research Conference, 1996.

    Powell, W. B. and Cheung, R. K., "Stochastic Programs over Trees with Random Arc Capacities," Networks, Vol. 24, 161-175, 1994.

    Powell, W. B. and Cheung, R. K., "Network Recourse Decomposition Method for Dynamic Networks with Random Arc Capacities," Networks, Vol. 24, 369-384, 1994.

    Cheung, R. K., C.-L. Li and W. Lin, "Inter-block Crane Deployment in Container Terminals," Transportation Science, forthcoming.

    Xiao, W.-Q. and C.-L. Li, "Approximation Algorithms for Common Due Date Assignment and Job Scheduling on Parallel Machines," IIE Transactions, forthcoming.

    Bish, E. K., T.-Y. Leong, C.-L. Li, J. W. C. Ng and D. Simchi-Levi, "Analysis of a New Vehicle Scheduling and Location Problem," Naval Research Logistics, 2001.

    Wan, G., B. P.-C. Yen and C.-L. Li, "Single Machine Scheduling to Minimize Total Compression Plus Weighted Flow Cost is NP-hard," Information Processing Letters, 2001.

    Li, C.-L. and P. Kouvelis, "Flexible and Risk-Sharing Supply Contracts under Price Uncertainty," Management Science, 1999.

    Li, C.-L. and T. C. E. Cheng, "Due-Date Determination with Resequencing," IIE Transactions, 1999.

    Liu, L. and Lian, Z. "(s,S) continuous review models for inventory with fixed lifetimes," Operations Research, Jan.-Feb., 1999.

    Zhang, C., Wan, Y.-w., Liu, J. and Linn, R. [2002]. "Dynamic crane deployment in container storage yards", Transportation Research: Part B Methodological, Vol.36, No.6, pp.537-555.

    Tang, L., Luh, P.B., Liu, J. and Fang L. [2002]. "Steelmaking process scheduling using Lagrangean relaxation", International Journal of Production Research, Vol.40, No.1, pp. 55-70.

    Tang, L., Liu, J., Rong A. and Yang, Z. [2001]. "An effective heuristic algorithm to minimize stack shuffle in selecting steel slabs from the slab yard for heating and rolling ", Journal of the Operational Research Society, Vol. 52, No. 10, pp. 1091-1097.

    Tang, L., Liu, J., Rong A. and Yang, Z. [2001]. "A review of planning and scheduling systems and methods for integrated steel production", European Journal of Operational Research, Vol. 133, pp. 1-20.

    Liu, J. and Reeves, C.R. [2001]. "Constructive and composite heuristic solutions to P//Sum(Ci) scheduling problem", European Journal of Operational Research, Vol. 132, pp. 439-452.

    Zhang, X. and Liu, J. [2001]. "China' imminent entry into WTO and impacts on the position of Hong Kong as a shipment hub (Part II)", Hong Kong Logistics, No. 1(2001), pp. 14-21.

    Zhang, X. and Liu, J. [2001]. "China' imminent entry into WTO and impacts on the position of Hong Kong as a shipment hub (Part I)", Hong Kong Logistics, No. 6(2000), pp. 4-8.

    Tang, L., Liu, J., Rong A. and Yang, Z. [2000]. "A multiple traveling salesman problem (MTSP) model for hot rolling scheduling in Baoshan Iron & Steel Complex", European Journal of Operational Research, Vol. 124, pp. 267-282.

    Cheung, R., Liu, J. and Wan, Y.-w., [2000]. "Education Initiatives on Logistics and Supply Chain Management for Service Providers in Hong Kong", in Johnson and Pyke (ed.): Supply Chain Management: Innovations for Education, POMS Series in Technology and Operations Management, Vol. 2, pp. 57-67.

    Tang, L., Liu, J., Rong A. and Yang, Z. [2000]. "A mathematical programming model for scheduling steelmaking-continuous casting production", European Journal of Operational Research, Vol. 120, pp. 423-435.



     
     
    Домашняя страница
    E-mail
    Телефон
    2358-8234
    Факс
    2358-0062
    Адрес
    Hong Kong, Kowloon, Hong Kong University of Science and Technology Clear Water Bay.